Send Message
Home ProductsCrawler Mucking Loader

Highly Integrated Technology Mucking Loader For Water Diversion Tunnel Project

Certification
China Shandong Shante Heavy Industry Machinery Co., Ltd. certification
China Shandong Shante Heavy Industry Machinery Co., Ltd. certification
I'm Online Chat Now

Highly Integrated Technology Mucking Loader For Water Diversion Tunnel Project

Highly Integrated Technology Mucking Loader For Water Diversion Tunnel Project
Highly Integrated Technology Mucking Loader For Water Diversion Tunnel Project

Large Image :  Highly Integrated Technology Mucking Loader For Water Diversion Tunnel Project

Product Details:
Place of Origin: shandong
Brand Name: Shante
Certification: ISO
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: negotiate
Packaging Details: package
Delivery Time: 5-8 day
Payment Terms: negotiate

Highly Integrated Technology Mucking Loader For Water Diversion Tunnel Project

Description
Product Name: Crawler Mucking Loader Applicable Industries: Construction Works
Marketing Type: Ordinary Product Certificate: ISO9001
Feature: Mineral Equipment Keywords: Mucking Loader

Product Descripton

-The Mucking Loader for Water Diversion Tunnel Project is the new machine with highly integrated technology of optical, mechanical, electric and hydraulic which is mainy designed for water diversion tunnel project.

-Designed with the sturdy construction with high strength, it can support the machine with stable and consistent operation with outstanding performance. And it is endurable with the resistance to corruption, oxygen and water, greatly extending its service time.

-With scientific and ergonomic design, it is equipped with the comfortable seat and cab in order to reduce the labour strength of the workers. And it is convenient to use with simple operation.

-It is widely used for mining of coal mine, metal mine, non-metal mine and tunnel digging of hydropower project and subway station tunnel project and steel factory steel ladle, etc.

-Known as a enviromentally friendly products, it is green with no harmful substances, harmless to the nature and the human body. And the Mucking Loader for Water Diversion Tunnel Project  has superior quality which is manfactured with strict standards to make sure its stable operation with outstanding performance

Product Specificaiton

Excavating Width(mm)

5300

Excavating Length(mm)

1970

Excavating Height(mm)

3090

Excavating Depth(mm)

550

Unloading Height(mm)

1760(changeable)

Minimum Loading Height(mm)

1480(Changeable)

Unloading Distance(mm)

1700(changeable)

Maximum Rotation Angle(°)

±50

Weight(T)

10.8

Dimension(mm)

7100x1800x2200

Loading Capacity(m³/hour)

100

Min Turning Radius(mm)

6000

Climbing Ability(°)

≤32(hard ground)

Travelling Speed(m/min)

2-3.8

Applied Tunnel Gradient(°)

≤30

Motor Power(kw)

45

Maximum Material By Size(LxWxH) (mm)

650x700x680

Ground Clearance(mm)

320

Applied Working Section(W*H) (m)

≥2.4x2.4

Nominal Working Pressure(Mpa)

20

image001.jpgimage002.jpg

Contact Details
Shandong Shante Heavy Industry Machinery Co., Ltd.

Contact Person: Ms. Icy Guo

Tel: +8619811866598

Send your inquiry directly to us (0 / 3000)