Product Details:
|
Product Name: | Underground Mining Excavator | Applicable Industries: | Construction Works |
---|---|---|---|
Marketing Type: | Ordinary Product | Certificate: | ISO9001 |
Feature: | Mineral Equipment | Keywords: | Mucking Loader |
Mini Tunnel Excavator
Daily servicing work
For the daily servicing work, the following works shall be completed by specific operators:
No. |
Check item |
1 |
Check the tension of track/chain, left & right |
2 |
Check joints and the base plate of track/chain, left & right |
3 |
Check the mucking loader for oil leakage (The hose joint shall be firmly locked when any hose or hose joint is re-tightened, so as to avoid twisting) |
4 |
Check the tension of triangle belt |
5 |
(In order to avoid condensate formed prior to the next start, the fuel tank shall be fully filled up after use every day. After filling-up, the filler cap shall be closely tightened to ensure tightness) |
6 |
Check the air filter element |
7 |
Check the hydraulic cylinder head/cooling fins |
Check of operating mechanism
No. |
Check item |
1 |
Check possible cracks through visual check |
2 |
Check hoses for leakage (The hose joint shall be firmly locked when any hose or hose joint is re-tightened, so as to avoid twisting) |
3 |
Check hoses for wear |
4 |
Check the hydraulic cylinder for wear and leakage |
5 |
Check the copper bush for wear or movement |
6 |
Check the damper gear for wear |
7 |
Check bolts and the housing |
8 |
Check bucket teeth and fixing devices |
9 |
Check whether nuts on the grab tilting lever are well fixed |
Contact Person: Ms. Icy Guo
Tel: +8619811866598